Identifier
en
TARP2023_SU_9010
Title
en
TARP2023 Stratigraphic Unit 9010
Context type
en
fill
Context subtype
en
Construction Trench Fill - Architecture
Context formation category
en
Creation/Construction
Description
en
SU 9010 represents the construction trench fill for cut SU 9009 used in the creation of the north wall of the Area D (WS 98). SU 9010 was first discovered within window SU 9008, however the window created for SU 9008 cut across the construction cut (SU 9009) and was intermixed with materials from subfloor fill SU 9004. SU 9010 consists of only construction trench fill.
Excavation date
December 6, 2023
Record creator
Investigation area
Investigation site
Truncated
false
Date Created
May 30, 2024
Rights Holder
en
University of Cincinnati (US)
License
en
CC-BY 4.0
Other Media
Linked resources
TARP2023 Trench 9000 |
Plane | Position | Flip |
|
||
|
||
|
Show planes | Show edges |
Measured length
0.0
0.0
Coordinates
[ 0 , 0 , 0 ]
[ 0 , 0 , 0 ]
Check All