carried out by is resource with ID
3686
Image | Title | Entity | Type | Description | Creation date |
---|---|---|---|---|---|
TH2023 Trench 10000 | Investigation area | excavation trench | 2023-06-12 | ||
TH2022 SU 5039 | Context (fill/layer/deposit) | Fill | Orange brown surface layer | 2023-06-07 | |
TH2022 SU 5038 | Context (fill/layer/deposit) | Fill | Mortar smear, continuation of 5010 | 2023-06-07 | |
TH2022 SU 5036 | Context (fill/layer/deposit) | Fill | Fill of S wall foundation trench | 2023-06-07 | |
TH2022 SU 5033 | Context (fill/layer/deposit) | Fill | Subfloor fill through entire trench extension | 2023-06-07 | |
TH2022 SU 5032 | Context (fill/layer/deposit) | Fill | Mortar surface in center of trench | 2023-06-07 | |
TH2022 SU 5020 | Context (fill/layer/deposit) | Fill | Fill of construction trench cut 5019 | 2023-06-07 | |
TH2022 SU 5005 | Context (fill/layer/deposit) | Fill | Subfloor fill throughout entire trench | 2023-06-07 |