Identifier

GH2019_T_1_L1

Type

en excavation trench

Title

GH2019 trench 1 layer 1

Description

The first layer of the rectangular 6 x 2-meter large trench excavated on the starboard side amidships with NW-SE orientation. 

Record creator

P. Derudas

Investigation site

Gribshunden

Investigation dates

August 27, 2019

B. Foley
J. Rönnby
Phil Short
Jon Adams
Kroum Batchvarov
Mikael Björk
Rodrigo Pacheco
Rolf Warming

Investigation technique

en other

Model measure unit

en meter

Longitude shift

513000

Latitude shift

6222000

Spatial reference system (EPSG)

EPSG:3006

Date Created

May 4, 2021

Rights Holder

LU

License

en CC-BY 4.0


Linked resources

Items with "Investigation area: GH2019 trench 1 layer 1"
Gribshunden Campaign 2019
Items with "Investigation area: GH2019 trench 1 layer 1"
GH2019 layer 1
GH2019 layer 1 Barrel lids
GH2019 layer 1 barrel staves
GH2019 layer 1 beam shelf
GH2019 layer 1 frames
GH2019 layer 2 artefacts
GH2019 layer 2 barrel lids
GH2019 layer 2 barrel staves
Items with "Investigation area: GH2019 trench 1 layer 1"
GH2019 find A19
GH2019 find A21
GH2019 find A23
GH2019 find A4
Items with "Trench(es) described: GH2019 trench 1 layer 1"
GH2019 Report 1










PlanePositionFlip






Show planes Show edges
Measured length
0.0
Coordinates (EPSG:3006)
[ 0 , 0 , 0 ]
Layers:
Check All
Models
GH20190827_1
Contexts
GH2019_L1_BL_1
GH2019_L1_BL_2
GH2019_L1_BL_3
GH2019_L1_BL_4
GH20190827_1
GH2019_L1_BS_1
GH2019_L1_BS_2
GH2019_L1_BS_3
GH2019_L1_BS_4
GH2019_L1_BS_5
GH2019_L1_BS_6
GH2019_L1_BS_7
GH2019_L1_BS_8
GH2019_L1_BS_9
GH2019_L1_BS_10
GH2019_L1_BS_11
GH2019_L1_BS_12
GH20190827_1
GH2019_L1_F_1
GH2019_L1_F_2
GH2019_L1_F_3
GH2019_L1_F_4
GH20190827_1
GH2019_L1_BSh_1
GH20190827_1
Units
1 / 1
GH20190827 siteplan