Identifier

GH2019_T_1_L5

Type

en excavation trench

Title

GH2019 trench 1 layer5

Description

The fifth layer of the rectangular 6 x 2-meter large trench excavated on the starboard side amidships with NW-SE orientation. 

Record creator

P. Derudas

Investigation site

Gribshunden

Investigation dates

August 31, 2019

Investigation technique

en dredge

Model measure unit

en meter

Longitude shift

513000

Latitude shift

6222000

Spatial reference system (EPSG)

EPSG:3006

Date Created

May 11, 2021

Rights Holder

LU

License

en CC-BY 4.0


Linked resources

Items with "Investigation area: GH2019 trench 1 layer5"
Gribshunden Campaign 2019
Items with "Investigation area: GH2019 trench 1 layer5"
GH2019 layer 5
GH2019 layer 5 barrel staves
GH2019 layer 5 barrels
GH2019 layer 5 beam shelf
GH2019 layer 5 frames
GH2019 layer 5 futtocks
GH2019 layer 5 lapstrake planking
GH2019 layer 5 top timber
Items with "Trench(es) described: GH2019 trench 1 layer5"
GH2019 Report 1










PlanePositionFlip






Show planes Show edges
Measured length
0.0
Coordinates (EPSG:3006)
[ 0 , 0 , 0 ]
Layers:
Check All
Models
GH20190831_1
Contexts
GH20190831_barrel1
GH20190831_barrel2
GH20190831_1
GH20190831_L5_barrelstave1
GH20190830_L5_barrelstave2
GH20190830_L5_barrelstave3
GH20190830_L5_barrelstave4
GH20190830_L5_barrelstave5
GH20190830_L5_barrelstave6
GH20190830_L5_barrelstave7
GH20190830_L5_barrelstave8
GH20190831_1
GH20190902_L5_futtock1
GH20190902_L5_futtock2
GH20190902_L5_futtock3
GH20190902_L5_futtock4
GH20190831_1
GH2019_L5_beam_shelf
GH20190831_1
GH20190830_L5_toptimber
GH20190831_1
GH20190831_L5_lapstrake_planking1
GH20190831_L5_lapstrake_planking2
GH20190831_L5_lapstrake_planking3
GH20190831_1
GH20190831_L5_frame1
GH20190831_L5_frame2
GH20190831_L5_frame3
GH20190831_1
Units
1 / 1
GH20190831 siteplan