Identifier
en
TARP2023_SU_9091
Title
en
TARP2023 Stratigraphic Unit 9091
Context type
en
Fill
Context subtype
en
Construction Trench Fill - Architecture
Context formation category
en
Creation/Construction
Description
en
SU 9091 represents the dense green clay fill of construction trench SU 9090. Like the green clay used to bond the stones of wall SU 9087 together, green clay SU 9091 was used to bond the stones of SU 9086 together, but SU 9091 was also spread thicker and wider at the base of wall SU 9087 in order to fill construction trench cut SU 9090.
Excavation date
June 7, 2023
Record creator
Investigation area
Investigation site
Date Created
May 30, 2024
Rights Holder
en
University of Cincinnati (US)
License
en
CC-BY 4.0
Linked resources
TARP2023 Trench 9000 |
Plane | Position | Flip |
|
||
|
||
|
Show planes | Show edges |
Measured length
0.0
0.0
Coordinates
[ 0 , 0 , 0 ]
[ 0 , 0 , 0 ]
Check All