Identifier

en TARP2023_SU_8020

Title

en TARP2023 Stratigraphic Unit 8020

Context type

en Fill

Context subtype

en Construction Trench Fill - Architecture

Context formation category

en Creation/Construction

Description

en SU 8020 represents the material laid in preparation for the base lining SU 8013 and construction of Drain 3. Because SU 8020 was mostly located underneath Drain 3, we were unable to clearly identify it as a separate SU under a larger cross-section underneath Drain 3 was revealed. For this reason, SU 8020 was not provided an SU number until after it had been fully revealed in the cross section. As SU 8020 supports Drain 3 neither will be removed. Photos of SU 8020 include a detail photo of the cross-section showing SU 8020 located directly underneath the tile lining (SU 8013) under Drain 3. A small portion of SU 8020 may have been excavated as part of SU 8005, but it was not distinguishable in that SU from the rest of the fill material that made up SU 8005.

Record creator

Investigation area

Investigation site

Date Created

May 30, 2024

Rights Holder

en University of Cincinnati (US)

License

en CC-BY 4.0


Linked resources

Items with "Contexts: TARP2023 Stratigraphic Unit 8020"
TARP2023 Trench 8000










PlanePositionFlip






Show planes Show edges
Measured length
0.0
Coordinates
[ 0 , 0 , 0 ]
Layers:
Check All
J 495 3D
J 513 SU 9017-23 3D